Ethiopia electricity statistics
Installed capacity, generation, consumption, exports, losses and electricity access for Ethiopia, compiled from IRENA, the Ministry of Water and Energy, Ethiopian Electric Power and the World Bank. Every figure carries the period it describes.
Installed renewable capacity, 2016–2025
Ethiopia's renewable generating capacity rose from 5,989 MW at end-2024 to 10,082 MW at end-2025, an increase of 4,093 MW driven mainly by the Grand Ethiopian Renaissance Dam (GERD). Hydropower accounts for 91.4% of the total.
| Year | Hydro (MW) | Wind (MW) | Total renewable (MW) |
|---|---|---|---|
| 2016 | 2,159 | 324 | 2,649 |
| 2017 | 3,817 | 324 | 4,366 |
| 2018 | 3,817 | 324 | 4,451 |
| 2019 | 3,817 | 324 | 4,451 |
| 2020 | 4,071 | 324 | 4,713 |
| 2021 | 4,071 | 324 | 4,759 |
| 2022 | 4,821 | 404 | 5,589 |
| 2023 | 4,883 | 324 | 5,570 |
| 2024 | 5,221 | 404 | 5,989 |
| 2025 | 9,214 | 504 | 10,082 |
Source: IRENA Renewable Capacity Statistics 2026 · © IRENA. Installed capacity, not available capacity.
Capacity by technology, end-2025
| Technology | MW | Share |
|---|---|---|
| Hydro | 9,214 | 91.4% |
| Wind | 504 | 5.0% |
| Bioenergy | 335 | 3.3% |
| Solar | 22 | 0.2% |
| Geothermal | 7 | 0.1% |
Electricity balance, 2014–2024
In 2024, Ethiopia generated 20,596 GWh, of which 14,043 GWh reached final consumers, 1,671 GWh was exported and 4,819 GWh was lost in conversion and distribution. Hydropower supplied 96.5% of generation.
| Year | Generation (GWh) | Consumption (GWh) | Exports (GWh) | Losses (GWh) |
|---|---|---|---|---|
| 2014 | 8,692 | 5,635 | 740 | 2,317 |
| 2015 | 9,515 | 6,650 | 712 | 2,143 |
| 2016 | 10,461 | 8,172 | 166 | 2,085 |
| 2017 | 12,535 | 8,585 | 1,303 | 2,597 |
| 2018 | 13,214 | 8,816 | 1,432 | 2,945 |
| 2019 | 14,503 | 10,291 | 1,000 | 3,171 |
| 2020 | 15,192 | 10,933 | 1,000 | 3,208 |
| 2021 | 15,762 | 11,016 | 1,637 | 3,051 |
| 2022 | 15,472 | 10,232 | 1,671 | 3,514 |
| 2023 | 17,709 | 12,191 | 1,725 | 3,733 |
| 2024 | 20,596 | 14,043 | 1,671 | 4,819 |
Source: Ministry of Water and Energy, Energy Sector Brief 2026 (calendar years).
Generation mix, 2024
| Source | GWh | Share |
|---|---|---|
| Hydro | 19,870 | 96.5% |
| Wind | 685 | 3.3% |
| Thermal / waste-to-energy | 41 | 0.2% |
Access to electricity
The World Bank estimates that 56.6% of Ethiopians had access to electricity in 2024, up from 12.7% in 2000. Any electricity source: 65 % of households (Jan 2025, Mission 300 Compact). Tier 1 or better: 44 % of population (Jan 2025, Mission 300 Compact). EEU grid connections: 4.8 million (2024 (3.1 million in 2019), EEU via IEA, IEA (2026)). Solar mini-grids operating: 41 sites (39 EEU + 2 private; under 10,000 households (IEA, Oct 2026), IEA (2026)).
| Year | Access (% of population) |
|---|---|
| 2024 | 56.6 |
| 2023 | 55.4 |
| 2022 | 55.0 |
| 2021 | 54.2 |
| 2020 | 51.1 |
| 2019 | 48.0 |
| 2018 | 44.8 |
| 2017 | 44.3 |
| 2016 | 42.9 |
| 2015 | 29.0 |
| 2014 | 27.2 |
| 2013 | 30.8 |
Source: World Bank, World Development Indicators (EG.ELC.ACCS.ZS).
Grid and cross-border trade
| Indicator | Value | Period · source |
|---|---|---|
| Transmission lines | 20,673 km | Date not stated · EEP |
| Substations | 194 | Date not stated · EEP |
| Distribution losses | ~22 % | Reported Feb 2026 · EEP (reported) |
| Grid expansion planned | 8,700 km | FY 2025/26 plan · EEP (reported) |
| Transmission / commercial losses | ~6 / ~10 % | National Energy Compact, via IEA (Oct 2026) · IEA (2026) |
| Loss reduction target | 12.5 % | By 2030 (energy development strategy), via IEA · IEA (2026) |
| Distribution network | ~179,000 km | Current; 456,000 km targeted by 2030, via IEA · IEA (2026) |
| Transmission target | ~30,000 km | By 2030 (Ten-Year Development Plan), via IEA · IEA (2026) |
| Interconnector | Specification | Flow |
|---|---|---|
| Ethiopia–Kenya HVDC | ±500 kV · 2,000 MW rating · 1,045 km | 1,577.66 GWh supplied in Kenya FY2025/26 (to Jun 2026) · 200 MW peak today → 400 MW planned by Dec 2026 |
| Ethiopia–Djibouti | 230 kV interconnector | Operating export link; volumes not published separately |
| Ethiopia–Sudan | 230 kV interconnector | Export destination; volumes not published separately |
| Tanzania (wheeled via Kenya) | Via Kenyan grid | 100 MW six-month trial supply, concluded (reported Sep 2026); commercial agreement under negotiation |