HAYL · Ethiopia Energy Intelligence
Briefing
Edition of Wednesday 25 November 2026
No new verified changes in this edition
Figures, stages and check dates are carried forward unchanged. A source that could not be read keeps its previous value and date.
Latest signals
All signalsPlants and export links
Bubble area shows capacity. Select a plant for details.
Open tenders
Open tenders, nearest next step first · East Africa Time
Generation
National electricity balance and the plant fleet
Generation mix
Renewable capacity, 2016–2025
Installed at year end, MW
Electricity balance, 2014–2024
GWh per calendar year
Plant register
Major operating plants and tracked projects
Grid and export links
Network scale and cross-border power trade
Power leaving Ethiopia
Each link is drawn as wide as its rated capacity; the bright core is its reported peak flow. Links without a published rating are drawn as plain lines.
Lines join each link's end points in a straight line; they are not surveyed routes. Locations approximate, boundaries simplified.
Demand and access
Who has electricity, and how clean cooking is tracking
Access to electricity, 2000–2024
% of population
Projects
Stages reflect the latest dated public milestone, never an inferred one
Tracked generation by stage
MW of non-operating generation projects, public and IPP/PPP shown separately
Projects
Tenders and leads
Open tenders first. Status is worked out against the current time in Addis Ababa (EAT)
Open opportunities
Hybrid solar PV, backup power and WASH borehole equipment — long-term agreement
230 kV transmission line for new Injibara and Debark substations (design, supply, installation)
Consultancy: smart grid and digital transformation roadmap (REOI)
Closed tenders
Deadline passed. Kept for the record until an award or cancellation is reported
Planning leads
Plans and modelled requirements, not open procurement or committed finance
Historical milestones
Dated events already reported; not new announcements
Tariffs
The four-year path to cost-reflective electricity prices
Reform progress
Residential energy charge by monthly band
ETB/kWh · August 2024 vs Year-4 schedule (2027/28)
Financing
Approved programmes, agreements and stated requirements; approval is not disbursement
Signals
Dated developments. Sort by when they happened, or by when HAYL added them
What changed in this edition
Edition 25 Nov 2026
No new or materially updated records were verified in this edition.