Ethiopia Energy Intelligence
Capacity, generation, access, grid, pipeline and finance at a glance
Overview
Generation assets & interconnectors
Major plants and tracked projects · bubble area scaled to capacity
Generation mix
Renewable capacity, 2016–2025
Installed at year end, MW
Latest signals
Dated developments from official and DFI sources
Generation
National electricity balance and the plant fleet
Electricity balance, 2014–2024
GWh per calendar year
Plant register
Major operating plants and tracked projects
Grid & interconnectors
Network scale and cross-border power trade
Power leaving Ethiopia
Each link is drawn as wide as its rated capacity; the bright core is its reported peak flow. Links without a published rating are drawn as plain lines.
Lines join each link's end points in a straight line; they are not surveyed routes. Locations approximate, boundaries simplified.
Demand & access
Who has electricity, and how clean cooking is tracking
Access to electricity, 2000–2024
% of population
Project pipeline
Stages reflect the latest dated public milestone, never an inferred one
Tracked generation by stage
MW of non-operating generation projects, public and IPP/PPP shown separately
Projects
Opportunities & leads
Open tenders first. Status is worked out against the current time in Addis Ababa (EAT)
Open opportunities
Solar-powered water pumps for woredas in Sidama (re-tender, local suppliers only)
PRIME-1 transmission lines for four substations (design, supply, installation)
Telecom site power: hybrid storage, solid-state batteries, fuel cells and wind-solar systems (request for information)
Hybrid solar PV, backup power and WASH borehole equipment — long-term agreement
Consultancy: change-management needs assessment (REOI)
230 kV transmission line for new Injibara and Debark substations (design, supply, installation)
Closed tenders
Deadline passed. Kept for the record until an award or cancellation is reported
Planning leads
Plans and modelled requirements, not open procurement or committed finance
Historical milestones
Dated events already reported; not new announcements
Tariffs & policy
The four-year path to cost-reflective electricity prices
Reform progress
Residential energy charge by monthly band
ETB/kWh · August 2024 vs Year-4 schedule (2027/28)
DFI & finance
Approved programmes, agreements and stated requirements; approval is not disbursement
Market signals
Dated developments. Sort by when they happened, or by when HAYL added them
What changed in this edition
Edition 5 Nov 2026
- AddedSignalEEU opens 11 EV fast-charging stations in six citiesevent or publication 31 Oct 2026